Kite Hill Lane Project:

This project involved the removal and replacement of the windows in the master bedroom, requiring the creation of a secure pathway to the upstairs work area and protective measures to shield the room from weather exposure during the process.

To prepare for this project, we began by clearing the pathway leading to the master bedroom, ensuring it was free of obstacles and ready for the safe transport of tools and materials. Durable floor protection was installed along the route to prevent damage from foot traffic and equipment. In the master bedroom, all furniture was carefully relocated to allow unobstructed access to the work area. We then implemented weatherproofing measures, including sealing off the window openings with heavy-duty plastic sheeting to guard against wind and precipitation. Non-work areas were taped off to prevent dust and debris from spreading. These steps ensured the project could proceed efficiently while maintaining the integrity of the home and protecting it from external elements.

Previous
Previous

Polpis Road

Next
Next

York Street